Ober447
Ober447
  • 21
  • 552 255
Yellowstone slideshow
October 2018, Mammoth Hot Springs & Lemar Valley.
Music credit: ua-cam.com/video/KR9JNVBbTgE/v-deo.html
Переглядів: 244

Відео

The Paving Song
Переглядів 50 тис.5 років тому
Old county road ( old town road remix parody Lil nas X Billy Ray Cyrus) parody song is from an unknown artist. The source was a UA-cam video that has been since deleted. Just having a little fun with the sound track.
Leeboy 8515, winter paving
Переглядів 9 тис.5 років тому
A rare winter paving job in Eastern Canada in November 2018. When a culvert replacement goes late and winter comes early the road must be paved. The job was canceled twice due to snow and with another snowstorm forecast for that afternoon the job had to get done even though temperatures were -8 degrees Celsius (17 degrees Fahrenheit). The job was completed by Hogan Paving in Fredericton New Bru...
Guide Rail removal 101
Переглядів 2,4 тис.5 років тому
An overview of the Guide Rail Removal process in the province of New Brunswick by Eastern Fence Ltd under contract to The New Brunswick Department of Transportation and Infrastructure. Rte # 635, Lake George, New Brunswick. Locate the area on Google Earth with the following Coords. Location: 45°52'26.24"N, 66°59'34.48"W Produced by: Lindsay Carr, DTI: www.gnb.ca/0113/ Thanks to: Eastern Fence: ...
Asphalt milling 101 Overview
Переглядів 268 тис.5 років тому
An overview of the cold milling Asphalt process in the province of New Brunswick by Maritime road recycling (Northern Group). under contract to The New Brunswick Department of Transportation and Infrastructure. Rte # 4, Contract # 18-0551, McAdam, New Brunswick, Mill, Base and Seal. Locate the area on Google Earth and drive it with "Street View" before the project with the following Coords. Loc...
HDR CX405 camera zoom demo
Переглядів 6015 років тому
A demo of the zoom on the Handycam HDR CX405. For the price of this econo cam the zoom is amazing. The clip shows the zoom at well over a mile in distance. You can check out the area where the video was taken in Street view on Google Earth at the following coords, 45°41'32.78"N, 66° 7'1.40"W
Road Construction Montage
Переглядів 1,5 тис.5 років тому
A montage of road construction videos and stills from the Province of New Brunswick that I have taken over the years. Companies shown in the video: www.millergroup.ca/ northerngroupco.com/ avlconstructiongroup.ca/ www.companylisting.ca/Classic_Construction_Ltd/default.aspx www.dexter.ca/ www.lavoieconrad.ca/en Audio tracks by: chriszabriskie.com/
Highway Crack seal Overview
Переглядів 1,2 тис.5 років тому
An overview of the rubberized crackseal process in the province of New Brunswick by AVL Construction Group under contract to The New Brunswick Department of Transportation and Infrastructure. Rte 101, Welsford, New Brunswick, Crackseal. Locate the area on Google Earth and drive it with "Street View" before the project with the following Coords. Location: 45°27'1.27"N, 66°20'15.80"W Equipment: C...
Graveling over a chipseal road
Переглядів 1,1 тис.5 років тому
An overview of the Graveling over Chipseal process in the province of New Brunswick by Maritime Road Recycling (Northern Group). under contract to The New Brunswick Department of transportation and Infrastructure. Contract # 18-0590, Rte 690, Douglas harbor, New Brunswick, Gravel and Chipseal. Locate the area on Google Earth and drive it with "Street View" before the project with the following ...
Evandale Cable Ferry, New Brunswick
Переглядів 6776 років тому
This is a bit of a departure from my regular videos but highways aren't the only type of transportation infrastructure, we have Ferries here in New Brunswick. We have both cable (river) ferries and self-propelled ferries, the largest being salt water ferries. This is The Evandale ferry at Evandale, New Brunswick on Canada's East coast. She is christened the Robert J. Irwin (F49) and traverses a...
Asphalt Core Drilling Overview
Переглядів 4,2 тис.6 років тому
An overview of the Asphalt core drilling process in the province of New Brunswick by Maritime Road Recycling (Northern Group). under contract to The New Brunswick Department of transportation and Infrastructure. Rte # 620, Contract # 18-0487, Royal Road, New Brunswick, FDR, Base and Seal. Produced by Lindsay Carr, DTI: www.gnb.ca/0113/ Thanks to: Northern Construction Group: northerngroupco.com/
Loose mix asphalt sampling (MTV method)
Переглядів 2,5 тис.6 років тому
An overview of the Loose Mix Asphalt Sampling (MTV Method) in the province of New Brunswick by Northern Construction (Northern Group). under contract to The New Brunswick Department of transportation and Infrastructure. Produced by Lindsay Carr, DTI: www.gnb.ca/0113/ Thanks to: Northern Construction Group: northerngroupco.com/
Highway shouldering
Переглядів 6 тис.6 років тому
An overview of the Highway Shouldering process in the province of New Brunswick by Northern Construction (Northern Group). under contract to The New Brunswick Department of transportation and Infrastructure. Rte # 3 & 4, Contract # 16-0116, McAdam, New Brunswick, FDR, Base and Seal. Locate the area on Google Earth and drive it with "Street View" before the project with the following Coords. Loc...
Base asphalt paving Overview
Переглядів 16 тис.6 років тому
An overview of the Base asphalt paving process in the province of New Brunswick by Northern Construction (Northern Group). under contract to The New Brunswick Department of transportation and Infrastructure. Rte # 3 & 4, Contract # 16-0116, McAdam, New Brunswick, FDR, Base and Seal. Locate the area on Google Earth and drive it with "Street View" before the project with the following Coords. Loc...
Full Depth Asphalt Recycling Overview
Переглядів 112 тис.7 років тому
An overview of the Full Depth Asphalt Recycling process in the province of New Brunswick by Maritime road recycling (Northern Group). under contract to The New Brunswick Department of transportation and Infrastructure. Rte # 630, 3 & 4, Contract # 16-0116, McAdam, New Brunswick, FDR, Base and Seal. Locate the area on Google Earth and drive it with "Street View" before the project with the follo...
Asphalt Leveling overview
Переглядів 14 тис.7 років тому
Asphalt Leveling overview
Pulverizing overview
Переглядів 9 тис.7 років тому
Pulverizing overview
Bridge Paving Overview
Переглядів 10 тис.7 років тому
Bridge Paving Overview
Micro Surfacing, before and after
Переглядів 5348 років тому
Micro Surfacing, before and after
Micro Surfacing Overview
Переглядів 25 тис.8 років тому
Micro Surfacing Overview
Chipseal Overview
Переглядів 18 тис.8 років тому
Chipseal Overview

КОМЕНТАРІ

  • @michaelg1060
    @michaelg1060 2 місяці тому

    That's the easy way, guy don't have to keep start and stop...but when you had a bunch of Tri-axles, it was tough on the driver.

  • @michaelg1060
    @michaelg1060 2 місяці тому

    That's the only job I hated driving dumps for many years, most of us did--damn milling. You couldn't crawl slow enough for those damn machines back in the day. Even in granny, you'd have to push in the clutch, let it out slow and the guy would make the slow down sign again. That's the only time I ever needed a clutch adjustment in my life was when there was a milling job lasted a month! Whole fleet needed clutch adjustments!! For you kids out there who have only drove the automatics, we most of us never used our clutch except to put her in gear....and the DAMN MILLINGS!! LOL!! Hell, I miss hauling asphalt so much I wouldn't bitch about a milling job never again!! Would of been nice to have an automatic, MILLINGS Made Easy.

  • @user-mq6so2wq8r
    @user-mq6so2wq8r 3 місяці тому

    Change some teeth too pattern looks bad hopefully they have the grade up a few clicks so when they take that shoulder pass at full depth there is no ridge and they better run the petntiometer or slope cause that shoulder is definitely higher than 2 inches

  • @nicholasconstable6377
    @nicholasconstable6377 3 місяці тому

    Inspectors can't tell me nothing is the best part lol😂

  • @Locate2024
    @Locate2024 6 місяців тому

    What the farthest that thing can dog down to

    • @Ober447
      @Ober447 6 місяців тому

      Typically 2" but it can mill up to 6"

  • @thehoofersclub
    @thehoofersclub 8 місяців тому

    Damn, that black truck was hauling ass, came close to that worker. Only one roller used?

    • @Ober447
      @Ober447 8 місяців тому

      No, three rollers. same as you would use for hotmix

  • @ajnabeeindia1827
    @ajnabeeindia1827 8 місяців тому

    Wow

  • @bentonthurmond8609
    @bentonthurmond8609 9 місяців тому

    Clean the spray tip on spray bar. Clean the tips on the lower conveyor the two clean the two tips on the upper conveyor, clean the two tips for the spray for the fan that should be on so there’s no dust. I ran a milling machine for 25 years.

  • @jorgediaz517
    @jorgediaz517 9 місяців тому

    A

  • @australianoutback
    @australianoutback 10 місяців тому

    This was so helpful for me man thanks for the video bro

  • @joventinoaraujo2390
    @joventinoaraujo2390 11 місяців тому

    Eu não falo inglês tem como fazer uma tradução pra português

  • @ashtoncolston2348
    @ashtoncolston2348 11 місяців тому

    Try 14 hr days milling 3 miles to dead end were from New Albany Indiana😂💪🏽

  • @kileyoleary5756
    @kileyoleary5756 11 місяців тому

    Its not SMA ,

  • @tylerchapman3605
    @tylerchapman3605 Рік тому

    Appreciate you making this video. I’m working on airport taxiways and runways and needed to get an idea of what is actually going to be happening on this side of things. Glad I now have an idea of what I’ll be looking at!

    • @VanessaSilvaCampos
      @VanessaSilvaCampos Рік тому

      ❤❤2eruggt8t Tig8ohohk 9uhodfiigo. Bb87i ወተት pra a 5245y7rff87rurtffv. Tdyutyir ለ. G88o. አይ. 🎉

  • @superlaw4611
    @superlaw4611 Рік тому

    Dear We badly need to set up roads between sudan and chad and nigar but we don't know the cost i mean money Google map it's important here If we doing this roads sudan land can receive 1 million container for doing business with west africa market Daily 20 truks can go by holding goods from sudan market and chain and other Thank you so much

  • @johnpirie3800
    @johnpirie3800 Рік тому

    I noticed the road base layer (in its milled/planed state) below the running surface also had cracks running through the pavement. The new matt may start to show similar signs of failure in the not to distant future. You may need to plane/mill deeper, as there appears to be a problem at a deeper level.

    • @Ober447
      @Ober447 Рік тому

      This particular job was a mill and seal project and its aim is to simply replace the wearing course and buy the road another 8 -10 years before a more comprehensive Mill, Base and Seal. When we want to slow down reflective cracking we will use a Full or Partial depth recycling mix then base and seal.

    • @johnpirie3800
      @johnpirie3800 Рік тому

      @@Ober447 Good man; you've bought yourself some time. Best wishes from Scotland.

  • @shanefike2016
    @shanefike2016 Рік тому

    Bam

  • @shanefike2016
    @shanefike2016 Рік тому

    Or top coat?

  • @shanefike2016
    @shanefike2016 Рік тому

    A11?

  • @shanefike2016
    @shanefike2016 Рік тому

    What mix is that?

    • @Why_not_me_9-24-81
      @Why_not_me_9-24-81 5 місяців тому

      It’s the asphalt they’re using. There are many different types. Each mixed differently so the asphalt guys call it mix instead of asphalt. They setup their pavers differently for different mixes. There is base. It uses bigger aggregate. Then binder and then the top coat is surface. The aggregate used in each mixture gets smaller and smaller. Those are just the generic names for the different layers. It gets more complex than that. They use a different mix for driveways. Usually because there isn’t a base or binder. Sometimes in parking lots they won’t use a base so they’ll use a special binder that acts as both. You get what saying? Mix is short for mixture. The mixture is the material being laid

  • @shanefike2016
    @shanefike2016 Рік тому

    Amen

  • @shanefike2016
    @shanefike2016 Рік тому

    Black gold baby

  • @shanefike2016
    @shanefike2016 Рік тому

    Damn

  • @shanefike2016
    @shanefike2016 Рік тому

    Brand new road

  • @shanefike2016
    @shanefike2016 Рік тому

    Love ya

  • @shanefike2016
    @shanefike2016 Рік тому

    Cool

  • @shanefike2016
    @shanefike2016 Рік тому

    Pyramid Company LLC

  • @shanefike2016
    @shanefike2016 Рік тому

    Hell yeah

  • @bturner2030
    @bturner2030 Рік тому

    Here I am sitting in my cubicle wishing I was operating a big ass construction machine!

  • @obilorpaschalemeka2803
    @obilorpaschalemeka2803 Рік тому

    Pls what is the name of this mechine

  • @daWizard.
    @daWizard. Рік тому

    Interesting

  • @garycox8985
    @garycox8985 Рік тому

    I love it like they say is he doing blacktop you don't know nothing don't tell me nothing

  • @TsunauticusIV
    @TsunauticusIV Рік тому

    Asphalt. Not ASHphalt.

  • @chrisanderson2487
    @chrisanderson2487 Рік тому

    I can smell this video

  • @garykennedy526
    @garykennedy526 Рік тому

    How many teeth on the cutting head?

  • @miketrudeau6619
    @miketrudeau6619 Рік тому

    Why no tack coat before the overlay patch?

    • @Ober447
      @Ober447 Рік тому

      Because the chipseal we are overlaying is rich in AC and the heat of the fresh overlay bonds the two lifts together. On top of that, a coat of 1/2" chip seal will be applied to the top of everything as a final surface to bond it all down.

  • @gtpmike2000
    @gtpmike2000 Рік тому

    Another awsome video keep them coming if you have them alwsys enjoy this stuff.

  • @Papascoffs
    @Papascoffs Рік тому

    My question is. What do they do with the old asphalt? Does it get colored darker, reconditioned and put back on the road?

    • @joepep3241
      @joepep3241 Рік тому

      Goes through a shaker put into separate piles at the asphalt plant then added into fresh asphalt as a filler according to the type and size of stone

  • @cjphillips6648
    @cjphillips6648 Рік тому

    I learned how the worn out road asphalt is used. Great video!

  • @CreamedAgain
    @CreamedAgain 2 роки тому

    In Australia we sideload semi trailers to make use of the room up front in the bin

  • @gerrycomfort7027
    @gerrycomfort7027 2 роки тому

    HEY IS WHAT HEY IS A

  • @jond1536
    @jond1536 2 роки тому

    Been on lots of these jobs, by the way the tailings are ECO-inert, so no special handling as it rains. most plants reuse a % into the mix as it saves money, the oil aka asphalt didn't go anywhere its in the tailings.

  • @phall9269
    @phall9269 2 роки тому

    Dun many any miles of this..easy peasy..night work was the challenge...

  • @prowelderno1
    @prowelderno1 2 роки тому

    Don’t put the asphalt through a screen, it removes the fines….put it through a small crusher, set to between 1/2 inch and and 1 inch. You will get 100% re-usable material ….goes down better and compacts way better …. All round nice video

  • @azshooter348
    @azshooter348 2 роки тому

    What's the pay rate for the loafers standing around with their hands in their pockets? Where do I apply?

    • @jond1536
      @jond1536 2 роки тому

      What would you have them do? all road jobs, local, state or federal REQUIRE a minimum number of employee as specified in the contract. It will depend on what the job entails. so the so-called "loafers" most likely have a critical part in the ENTIRE job, just not at the moment of video. 15 or more hour days are not unheard of and again what the contract specifies some jobs go 24/7.

  • @VIP_966
    @VIP_966 2 роки тому

    ‏إنني سواق عليها كيف يمكنني آتي إلى المانيا وكم راتبها

  • @bruceanderton1518
    @bruceanderton1518 2 роки тому

    I gave up on this because there was absolutely nothing happening initially...

  • @chickey333
    @chickey333 2 роки тому

    Excellent presentation. I was an inspector working with many building materials and structures. I learned more about my job over the years from the contractors who actually did the work then anyone else.

  • @RDC_Autosports
    @RDC_Autosports 2 роки тому

    i use to roll with the mill….one company that i’d haul the milling for in FL was a jerk he wouldn’t taper it and you’d get that drop off or huge bump at the end ✌🏻